====== 2022-10-31 Meeting Minutes ===== **Attendance:** * Ben Jackson * Ryan Marple **Opened:** 7:35\\ **Closed:** 8:25 ==== General Business ==== === Workbench === * Will collect on Saturday * Will find position to store it on Tuesday 1/11/2022. === Air lines: === * 6x Push fitting tees 12mm * 10x Pneumatic blanking plugs * 2x 3 output manifold * 3x 8mm Curly Hose * 3x 8mm push fitting * 3x Air Gun === Open Day: === * Note to team that this has been postponed indefinitely. May happen early to mid next year. ==== Projects ==== === Magnabend === * Eris has electrical paper. * Wire still needs to be wound. === Gas Bottle Safety === * Wait until gas monitoring project is done or further progressed. === Gas Monitoring System === * Lasercut frame. Assigned to Ryan. * Make first spin of mechanical system for trial. Assigned to Ben. * Code sensors for ESPhome use. * Find ESP for system. === Blue Lathe === * Working fine. No tasks assigned. === Green Lathe === * Electrician Required. Interlock is built and ready to go. Ryan to * Working fine. * Ryan to ask Dave Seff to engrave angles onto crossslide. === Milling Machine === * Ben has made a quill handle repositioner, but would like to upgrade it at a later date. * Interlock needs to be fixed and replaced. May require Ryan K. Ryan to ask. * Mill head needs proper lubrication. Ryan will ask Phil to do this. === Horizontal Bandsaw === * Non functional. * Waiting on electrician for switch replacement. Ryan to follow up. === HILDI === * Get new tool setter. assigned to Ryan * Mount usb hub. assigned to Ryan === YAG === * NUC HDD is low on space. Added task to look into it at a later date. * Consumables need to be ordered. * Shielding needs to be done. Assigned to Eris. * Order shielding film. Assigned to Ryan. * Mount water filter to drum trolley. assigned to Eris and Ryan. * Added YAG usage document as task. Assigned to Ryan. Chris Noonan may have info. === Plasma Cutter === * Awaiting Replacement. * Seek ~$1000 for plasma cutter. Make Proposal. Assigned to Ryan. === TIG Welder === * Awaiting replacement. === MIG Welder === * Working fine. * Ryan to replenish consumables. === Cold Cut Saw === * Blades need sharpening. Assigned to Eris. === Startrite Bandsaw === * Ben has inspected gearbox and needs more time to fix it. * Ryan to buy gear oil. === Electrician === * Green lathe interlock * Horizontal bandsaw switch * Ryan to follow up. ==== Member Report ==== The following members met their volunteer requirements for the month: * Ben Jackson * Eris Ryan * Ryan Marple * Dave Seff * Phil Juric