Open 20:35
Close 20:50
Author Michael King
Signed David Bussenschutt
Tally 19

  • Michael King
  • Luke Davies
  • Wayne Bruce
  • Craig Hudson Taylor
  • Lysa Singh
  • Ian Haly
  • David Bussenschutt
  • Beau Sandford
  • Michael Richmond
  • Eris Ryan
  • Rosa Tong
  • Megs Drinkwater
  • Mike Ando
  • Meka Beecham
  • Timothy Reichle
  • Brendan Halliday
  • Sven Hanzka
  • Sven Tiede
  • Michael Kent

- New Horizontal Bandsaw - Microcontroller-friendly Radiation Sensor - Chromecast Ultra for Green Room - Budget for Interlock v.2 Prototype

- Apologies - Steph Piper - SpaceBucks system for drinks machines is operational, please see Nog or Buzz for details - Members Storage is full, please clear any items you have and are not currently using as we only have 72 spaces for 130+ members - Green Lathe - looking for new items for lathe usage, will have more details and voting in an upcoming meeting

- Treasurer reports $4300 to spend in budget

- Horizontal Bandsaw - a hydraulic unit that is an upgrade to the one we already have, Hare and Forbes can give us a discount due to our non-profit status, required in a hurry so we can't use grant money to pay for this; 1 opposed, 2 abstained, motion passed. - Radiation Sensor - HSBNE is listed on SpaceDirectory, a site that lists various recordable items about the area surrounding various hackerspaces, this item will be mounted in a specific position and will record background radiation to post to SpaceDirectory; 0 opposed, 1 abstained, motion passed. - Chromecast Ultra - we are having issues with Youtube on the Green Room television, znd as such we are looking to upgrade the Chromecast that is attached to one that can be plugged directly into the network, the old unit will be transferred to the classroom for the projector; 0 opposed, 0 abstained, motion passed. - Interlock v.2 Budget - the new protoype should be more narrow than the current unit that is on the tablesaw, the cost should be less than $100 for the current transformer and other parts to make the prototype, once this is successful there will be a construction day scheduled for mass-production of the new interlocks; 0 opposed, 0 abstained, motion passed.

- Doug for cutting benchtops for the Digifab bench - Doug and Beau for the repairs to the dropsaw - Doug, Craig and Aaron for building the Digifab bench - Jaimyn for attempting to fix the Taz5 Octopi post-move

  • meetings/general/2017/20170704
  • Last modified: 4 years ago
  • (external edit)