Aliases | Iron |
Other References | |
Official Maintainer | Emily Taylor |
Working
Machine is working as expected. Last tested 09/11/2020
This machine does not require induction to use.
This iron is for preparing and finishing material for use in sewing projects.
This iron can be used for iron-on transfers.
Required | | Enclosed shoes are required, no open sandals, thongs etc |
Name | Value |
Height | 15cm |
Length | 28cm |
Width | 12cm |
Weight | 1.3kg |
Manufacturer
Known Identical Models
Date | Description | Workaround | Proposed Remediation |
NONE | PLACEHOLDER Describe the problem | PLACEHOLDER Describe the workaround currently in place | Placeholder Describe a proposed fix or solution |
Date | Modified By | Description | Remediation | Cost |
NONE | PLACEHOLDER NAME | PLACEHOLDER Describe what happened | PLACEHOLDER Describe how it was fixed or modified | PLACEHOLDER document the cost of the change |
Image | Category | Accessory Name & Notes | Location | Buy from |
NONE | PLACEHOLDER Category of accessory | PLACEHOLDER Accessory Name
PLACEHOLDER Description and usage notes for accessory | PLACEHOLDER Describe location of accessory | PLACEHOLDER Link to where it was bought from |
Image | Category | Accessory Name & Notes | Location | Buy from |
NONE | PLACEHOLDER Category of consumable | PLACEHOLDER Consumable Name
PLACEHOLDER Consumable description and usage | PLACEHOLDER Description of where the consumable is stored | PLACEHOLDER Link to where it can be bought |
Maintenance
Interval | Task |
Annual | Inspect iron for damage and to ensure cord is still intact |
Task / Action | Executive | Cause Leader
Cause Team | Named Maintainer | Trainers | Cause | Membership | Implementer |
Modification and Repairs | - | AC | C | I | I | I | R |
Induction changes | C | RACI | RC | I | I | I | R |
Risk Matrix and Mitigation
PLACEHOLDER: Risk assessment is important to ensure we are making tools available to members in a responsible fashion. Please make every effort to do a reasonable risk assessment. If there is a safety incident with the tool, please redo a risk assessment and add it to the table.
Ref / ID | Pre-Mitigation | Mitigations / Warnings / Remedies | Post Mitigation |
Risk | Risk Severity | Risk Likelyhood | Risk Level | Risk Severity | Risk Likelyhood | Risk Level | Acceptable to Proceed |
0001 | Burn to skin | Intolerable | Probable | 11 | PLACEHOLDER Induction to train users in correct usage | Low | Improbable | 1 | |
0002 | Catch fingers in ironing board | Intolerable | Probable | 11 | PLACEHOLDER Induction to train users in correct usage | Low | Improbable | 1 | |
0003 | Material catching fire | Intolerable | Probable | 11 | PLACEHOLDER Induction to train users in correct usage | Low | Improbable | 1 | |
PLACEHOLDER: A decision register is for general documentation when some decision is made regarding the tool. To change its location, mode of operation, to buy an accessory, to replace something, to change how it operates etc.
Ref / ID | Decision Details | Impact | Proposed Date | Proposed By | Status | Approved By | Date | Resulting Actions and Comments |
0000 | Example decision | Provides an example | 08/08/20 | JH | Approved | JH | 08/08/20 | A line was put in the register |