2022-05-23 Meeting Minutes
Meeting Opened: 20:05
Meeting Closed: 20:55
Author: Ryan Marple
Attending Members
Team Members
- Ryan Marple
- Ben Jackson
- Eris Ryan
- Phil Juric
Proxies
Non-team Members
General Business
YAG
- Eris and Nick building shield for YAG
- Eris working on NUC. NUC will be running virtual windows 7.
- After, ventilation will be solved.
• Order YAG plastic (Ryan)
Blue Lathe
- Nick has replaced the centrifugal switch.
• May need an electrician to sign off the work.
• Coolant pump is 3 phase wired as single phase
• Buy some drysorb: https://chemron.com.au/shop/cleaning/enviro-drysorb/?gclid=CjwKCAjw4ayUBhA4EiwATWyBrmhVNXKuqoK4nGOgaRhwbefSWTqr6mYAchUEBahWUzqJvI8xh7CPdBoC7uUQAvD_BwE (Ryan)
- Ben has made a new feed handle
Green Lathe
- Ben has made a new gear change handle
- Quick change tool post has been fitted to green lathe. Nut needed to be machined to size.
- Tight spot when moving carriage.
- Key is missing.
• Switch out estop to non missing variant
o Order estops (Ryan)
Horizontal Bandsaw
• Replace switch with new one.
Milling Machine
- Z axis locks fixed
• Order handles for Z locks. (Ryan)
• Purchase work lights (Phil)
- Gibs tightened on X
- Y axis slides are worn
Other
• Look into making 3 phase interlocks (Ben)
• Audits on items to put on retractors
- Ben has relabelled tool chest and tidied up
- Follow up on selling small mill
- Future focus
• Do a audit of consumables
Prioritizing Purchases
• New lathe motor for blue lathe.
• New vices
• Quick change tool holders
• Tooling for lathes
• Soluble oil
- teams/metalworking/minutes/2022053
- Last modified: 3 years ago
- by ryan6338